Betcrete - leaders in polycrete products
Print Friendly Page
Doors
LABOUR SAVING
Pre-cast hinge &
strikerplate holes
Saving on installation
COST SAVING
Costs less than similar timber,
steel or aluminium products
Doorframe Technical Specifications
DOOR FRAME
SIZE
STANDARD DOOR
TO FIT
BDF8/2100
845 x 2100mm
845 x 2100mm
762
BDF9/2100
900 x 2100mm
900 x 2100mm
813
BDF13/2100
1305 x 2100mm
1305 x 2100mm
1220
BDF17/2100
1700 x 2100mm
1700 x 2100mm
1613 DOUBLE
BDF9/21004H
900 x 2100mm
900 x 2100mm
813 FIRE
BDF9/2100ST
900 x 2100mm
900 x 2100mm
813 STABLE
  • BDF9/2100 - Cast in one mould (Transom, Hinge & Lock style in one)
  • Left hand & Right hand doorframes
  • BDF17/2100 & BDF13/2100 supplied in knock-down format
  • External Doorframe (Door sill) for open in or open outs
HINGES & STRIKERPLATE SETS (TO FIT OUR DOORFRAME)

  • GALVANIZED (INTERNAL USE)
  • BRASS (EXTERNAL USE)
  • STRIKER PLATES SLOTTED FOR ADJUSTMENTS
Patio Doors
PATIO DOORS TO FIT INTO OUR POLYCRETE DOORFRAME

BADD13/2100 1220 DOUBLE
BADD17/2100 1613 DOUBLE
BAD9/2100 813 SINGLE DOOR
BAD13/2100 1220 SINGLE DOOR
Aluminium Profile
Door Installation Procedures
WALL POSITIONING (90º / 180º)

Betcrete Frames are suitable to be positioned centre, inside or outside flush. It is recommended that all external frames (opening out) be installed with door stops.


Doorframe position for a 90º Opening

Doorframe position for a 180º Opening


SETTING UP PROCEDURE

A. FOR CAST IN ONE 8/2100 & 9/2100 & 13/2100 DOORFRAMES

  • Ensure doorframe is in position ( Square and plump)
  • Use Temporary timber supports (supplied by Builder) and (refundable) Templates (as per illustration)
  • After brickwork is dry, remove support and templates.

B. FOR 17/2100 DOORFRAMES

  • Place applicable (Refundable) jig within door frame. Clamp styles onto jig supplied with g-clamps.
  • Adjust T-stay until plumb in all directions.
  • Place transom (top piece) in position and align inside rebate on door side.
  • Bend out lugs and proceed with brickwork, filling mortar between frame and brickwork.
  • The reusable jigs must be kept in position until brickwork above the transom is dry.

ALLOW FOR SCREET BY WEDGING FROM OUR JIG

Back to top